PROJECT
Basepoint Business Centre
PROJECT CATEGORY
New Build
CLIENT
Morgan Sindall
VALUE
£330,000
COMPLETION DATE
July 2004
ROOFING/CLADDING TYPE
Euro-Clad Elite System (2)
Kingspan KS1000
PPC Aluminium Rain Water Goods & Associated Flashings
BRIEF DESCRIPTION
The roof construction consisted of a Euro-Clad Elite system (system 2). Coverworld Construction supplied and installed 0.7mm thick walk able liner panels, 200mm thick insulation with 32/1000 forward profile 0.7mm thick Corus colour coat HPS 200 top sheet (0.25 U Value achieved). Wall cladding consisted of Kingspan KS/1000 MR composite wall panels.